Journal of Applied Science and Engineering

Published by Tamkang University Press

1.30

Impact Factor

1.60

CiteScore

Song Yang1, Jianghua Zou1, Yan Luo1, Jian Liu1, Jin Tan1, Xueshi Yuan1, and Zhaoliang Zhang2This email address is being protected from spambots. You need JavaScript enabled to view it.

1Zunyi Power Supply Bureau of Guizhou Power Grid Co., Ltd, Zunyi, China

2Wuhan Kediao Power Technology Co., Ltd, Wuhan, China


 

 

Received: April 10, 2023
Accepted: September 24, 2023
Publication Date: November 16, 2023

 Copyright The Author(s). This is an open access article distributed under the terms of the Creative Commons Attribution License (CC BY 4.0), which permits unrestricted use, distribution, and reproduction in any medium, provided the original author and source are cited.


Download Citation: ||https://doi.org/10.6180/jase.202408_27(8).0008  


The uninterrupted operation of the distribution network is crucial for enhancing the security of power supply. However, factors such as environmental and line conditions may impede uninterrupted operation of overhead lines. Hence, this study conducts an analysis of factors that influence the uninterrupted operation of 10 kV overhead lines in distribution networks. To accomplish this, the Interpretative Structural Model (ISM) is employed to establish a hierarchical structure of the factors. Important factors are selected from this structure for the demand analysis of uninterrupted operation, and an optimization scheme for the design of overhead lines is proposed based on technical requirements for uninterrupted operation. Finally, the model is applied to optimize a real overhead line in a distribution network, thus validating the applicability of the proposed model.


Keywords: Distribution network overhead line, Power uninterrupted work, Interpretative Structural Model, Line design, Optimization scheme


  1. [1] H. Wu, Y. Xie, Y. Xu, Q. Wu, C. Yu, and J. Sun, (2022) “Resilient scheduling of MESSs and RCs for distribution system restoration considering the forced cut-off of wind power" Energy 244: 123081. DOI: 10.1016/j.energy.2021.123081.
  2. [2] A. Maomin, A. Junwei, S. Congcong, W. Qingze, Z. Shouqiang, and Z. Jiaming. “Research on Influencing Factors of Distribution Network Overhaul without Power Interruption Based on Analytic Hierarchy Process”. In: 2022 7th Asia Conference on Power and Electrical Engineering (ACPEE). IEEE. 2022, 1291–1295. DOI: 10.1109/ACPEE53904.2022.9783832.
  3. [3] X. Kong, C. Liu, Y. Shen, W. Hu, and T. Ma, (2020) “Power supply reliability evaluation based on big data analysis for distribution networks considering uncertain factors" Sustainable Cities and Society 63: 102483. DOI: 10.1016/j.scs.2020.102483.
  4. [4] Y. Liu, K. Ji, X. Fu, S. Wenrong, and H. Ren, (2019) “A review of the current situation of the development of distribution network strip operation robot technology" Power and Energy 40(4): 446–451.
  5. [5] Z. Qian, Y. Liu, and Z. Ye, (2021) “A review of the current situation and development of power distribution network strip operation" Power and Energy 42(1): 83–86.
  6. [6] Z. Su, K. Liu, X. Kui, B. Xiao, T. Liu, and P. Tang, (2017) “Status and development of power distribution non-stop operation technology" Power Supply 34(10): 60–66.
  7. [7] D. Wang, (2019) “Optimization of 110 kV transmission line design analysis" Doors and Windows (20): 153.
  8. [8] H. Tao, (2013) “Application and optimization of typical design schemes for 110 kV transmission lines" Enterprise Technology Development 32(Z1): 116–117.
  9. [9] X. Xie and Y. Tan, (2015) “Typical design scheme and optimization of 110 kV transmission line" Science and Technology Innovation and Application (32): 199.
  10. [10] W. M. Zeng, D. N. Liu, Y. Hu, J. P. Liu, X. G. Yang, and M. Fan, (2014) “Analysis of Low Carbon Influence Factors in Power Industry Based on the ISM" Applied Mechanics & Materials 675: 1721–1726. DOI: 10.4028/www.scientific.net/AMM.675-677.1721.
  11. [11] Y. Xu, K. Yang, and G. Zhao, (2021) “The influencing factors and hierarchical relationships of offshore wind power industry in China" Environmental Science and Pollution Research: 1–16. DOI: 10.1007/s11356-021-14275-w.
  12. [12] M. F. Ansari, R. K. Kharb, S. Luthra, S. L. Shimmi, and S. Chatterji, (2013) “Analysis of barriers to implement solar power installations in India using interpretive structural modeling technique" Renewable and Sustainable Energy Reviews 27(nov.): 163–174. DOI: 10.1016/j.rser.2013.07.002.
  13. [13] R. Feng and D. Cha. “Research on Risk System in Power Market Based on ISM”. In: 2nd International Conference on Risk Management and Engineering. 2008.
  14. [14] X. C. A. B, S. X. D. A. B, T. Y. C, and Q. Q. Y. D, (2022) “Research on influencing factors of line loss rate of regional distribution network based on apriori-interpretative structural model" Energy Reports 8: 53–64. DOI: 10.1016/j.egyr.2022.03.048.
  15. [15] Z. Bertalan, J. Kiss, and Z. Á. Tamus. “Technical economic feasibility study on Live Line maintenance on Hungarian transmission network”. In: 2014 11th International Conference on Live Maintenance (ICOLIM). IEEE. 2014, 1–4. DOI: 10.1109/ICOLIM.2014.6934349.
  16. [16] J. Gao, L. Wang, G. Li, Y. Fang, B. Song, B. Xiao, and K. Liu, (2020) “Discharge of air gaps during ground potential live-line work on transmission lines" Electric Power Systems Research 187: 106519. DOI: 10.1016/j.epsr.2020.106519.
  17. [17] J. Gao, L. Wang, G. Li, S. Wu, B. Song, C. Xie, L. Liu, and T. Wang, (2022) “Discharge characteristics of ground potential live-line work air gaps in cup towers and double circuit towers" Energy Reports 8: 285–291. DOI: 10.1016/j.egyr.2022.02.119.
  18. [18] A. Carreira, E. Cherney, R. Christman, E. Cleckley, J. Kuffel, A. Phillips, and J. Varner, (2013) “Guidelines for establishing diagnostic procedures for live-line working of nonceramic insulators" IEEE transactions on power delivery 29(1): 126–130. DOI: 10.1109/TPWRD.2013.2267455.
  19. [19] G. Göcsei, B. Németh, B. G. Halász, and J. Meixner. “Development of a live-line technology for insulator changing”. In: 2017 12th International Conference on Live Maintenance (ICOLIM). IEEE. 2017, 1–5. DOI: 10.1109/ICOLIM.2017.7964105.
  20. [20] R. G. Rodriguez. “Innovative new live line tool and framing designs”. In: 2017 IEEE 37th Central America and Panama Convention (CONCAPAN XXXVII). IEEE. 2017, 1–6. DOI: 10.1109/CONCAPAN.2017.8278495.
  21. [21] D. Szabó, G. Göcsei, B. Németh, C. Richárd, and L. Rácz. “Examination of clearances during high voltage live-line working”. In: 2019 IEEE Electrical Insulation Conference (EIC). IEEE. 2019, 104–107. DOI: 10.1109/EIC43217.2019.9046546.
  22. [22] N. Heuze. “Development for new heliborne baskets for live line work”. In: 2017 12th International Conference on Live Maintenance (ICOLIM). IEEE. 2017, 1–3. DOI: 10.1109/ICOLIM.2017.7964135.
  23. [23] J. Feng and W. Zhang, (2021) “An efficient rrt algorithm for motion planning of live-line maintenance robots" Applied Sciences 11(22): 10773. DOI: 10.3390/app112210773.
  24. [24] M. Zhu, T. Jiao, and H. Gong. “Comprehensive evaluation application analysis of the safety of distribution live work on 10 Kv”. In: 4th International Conference on Computer, Mechatronics, Control and Electronic Engineering. Atlantis Press. 2015, 924–927.
  25. [25] W. Mcdermid and D. Swatek, (2014) “Experience with dielectric surfaces of FRP tools used in live line work" IEEE Transactions on Dielectrics and Electrical Insulation 21(6): 2415–2427. DOI: 10.1109/TDEI.2014.004527.
  26. [26] A. Zhou, Y. Zheng, G. Bai, Y. Li, H. Yao, E. Dong, Y. Feng, K. Wu, S. Wu, H. Zhang, et al. “Visual Servo Method for Power Distribution Live-line Operation Robot Based on Hand-eye System”. In: 2022 IEEE International Conference on Mechatronics and Automation (ICMA). IEEE. 2022, 969–974. DOI: 10.1109/ICMA54519.2022.9856226.
  27. [27] S. Widlas. “Concept of installation of cable terminations on 110–400kV live line poles”. In: 2014 11th International Conference on Live Maintenance (ICOLIM). IEEE. 2014, 1–9. DOI: 10.1109/ICOLIM.2014.6934346.
  28. [28] L. Jia, X. Zhao, and Z. Zhang, (2021) “AISM-based study on the influencing factors of water conservancy project governance" China Rural Water Conservancy and Hydropower 5: 170–175+187.
  29. [29] W. Liu and L. Xu, (2021) “Identification of key fragility factors of manufacturing systems based on explanatory structural models and complex networks" Computer Integrated Manufacturing Systems 27(11): 3076–3092.
  30. [30] Y. Liang, H. Wang, and X. Zhao, (2022) “Analysis of factors affecting economic operation of electric vehicle charging station based on DEMATEL-ISM" Computers & Industrial Engineering 163: 107818. DOI: 10.1016/j.cie.2021.107818.
  31. [31] S. S. Kamble, A. Gunasekaran, and R. Sharma, (2020) “Modeling the blockchain enabled traceability in agriculture supply chain" International Journal of Information Management 52: 101967. DOI: 10.1016/j.ijinfomgt.2019.05.023.
  32. [32] S. Kumar, R. D. Raut, K. Nayal, S. Kraus, V. S. Yadav, and B. E. Narkhede, (2021) “To identify industry 4.0 and circular economy adoption barriers in the agriculture supply chain by using ISM-ANP" Journal of Cleaner Production 293: 126023. DOI: 10.1016/j.jclepro.2021.126023.
  33. [33] T. Tan, K. Chen, F. Xue, and W. Lu, (2019) “Barriers to Building Information Modeling (BIM) implementation in China’s prefabricated construction: An interpretive structural modeling (ISM) approach" Journal of Cleaner Production 219: 949–959. DOI: 10.1016/j.jclepro.2019.02.141.
  34. [34] S. Shi, (2022) “Analysis of factors influencing employment quality of college graduates based on explanatory structural model" Henan Social Science 30(1): 112–118.
  35. [35] Y. Hu, T. Liu, K. Liu, X. Zuo, Z. Ma, B. Xiao, S. Li, X. Weng, S. Ling, J. Zhang, P. Tang, Z. Su, L. Wang, X. Lei, W. Zhang, and W. Yang. Technical guide for live working on distribution line. 2019.


    



 

1.6
2022CiteScore
 
 
60th percentile
Powered by  Scopus

SCImago Journal & Country Rank

Enter your name and email below to receive latest published articles in Journal of Applied Science and Engineering.