Chung-Ho Chen 1 and Min-Tsai Lai2
1Department of Industrial Management, Southern Taiwan University of Technology, Yung-Kang, Taiwan 710, R.O.C.
2Department of Business Adminstration, Southern Tainan University of Technology, Yung-Kang, Taiwan 710, R.O.C.
Received:
October 8, 2004
Accepted:
April 27, 2005
Publication Date:
June 1, 2006
Download Citation:
||https://doi.org/10.6180/jase.2006.9.2.09
ABSTRACT
In this paper, a simple method is developed to find the unique combination (i, f) that will meet the average outgoing quality limit (AOQL) requirement, while also minimizing the average fraction inspected (AFI) for a CSP-M plan with specified number of inspection levels when the process average p(> AOQL) is known.
Keywords:
Multi-Level Continuous Sampling Plan (CSP-M Plan), Average Outgoing Quality (AOQ), Average Outgoing Quality Limit (AOQL), Average Fraction Inspected (AFI)
REFERENCES
- [1] Dodge, H. F., “A Sampling Inspection Plan for Continuous Production,” Annals of Mathematical Statistics, Vol. 14, pp. 264279 (1943).
- [2] Dodge, H. F. and Torrey, M. N., “Additional Continuous Sampling Inspection Plans,” Industrial Quality Control, Vol. 7, pp. 712 (1951).
- [3] Lieberman, G. J. and Solomon, H., “Multi-level Continuous Sampling Plans,” Annals of Mathematical Statistics, Vol. 26, pp. 686704 (1955).
- [4] Derman, C., Littauer, S. and Solomon, H., “Tightened Multi-level Continuous Sampling Plans,” Annals of Mathematical Statistics, Vol. 28, pp. 395404 (1957).
- [5] Schilling, E. G., Acceptance Sampling in Quality Control, Marcel Dekker, Inc. (1982).
- [6] Elliff, G. A. and Foster, J. W., “A Note on Calculation of the Average Fraction Inspected for a Continuous Sampling Plan,” International Journal of Production Research, Vol. 13, pp. 423425 (1975).