{"id":6119,"date":"2026-05-10T02:41:06","date_gmt":"2026-05-09T18:41:06","guid":{"rendered":"\/jase\/?post_type=tkuisotope&#038;p=6119"},"modified":"2026-07-01T15:55:58","modified_gmt":"2026-07-01T07:55:58","slug":"team-efficiency-estimation-for-construction-process-considering-the-collaborative-behaviors","status":"publish","type":"tkuisotope","link":"\/jase\/?tkuisotope=team-efficiency-estimation-for-construction-process-considering-the-collaborative-behaviors","title":{"rendered":"Team Efficiency Estimation for Construction Process Considering the Collaborative Behaviors"},"content":{"rendered":"\n<div class=\"wp-block-tkuwpbs5-bs5-row row article-info\">\n<div class=\"wp-block-tkuwpbs5-bs5-column col-md-3 align-self-start\">\n<p><i class=\"fa fa-folder\" aria-hidden=\"true\"><\/i>&nbsp;<a href=\"\/jase\/?page_id=6099\" data-type=\"page\" data-id=\"807\">2020<\/a><\/p>\n<\/div>\n\n\n\n<div class=\"wp-block-tkuwpbs5-bs5-column col-md-3 align-self-start\">\n<p><i class=\"fa fa-folder-open\" aria-hidden=\"true\"><\/i>&nbsp;<a href=\"\/jase\/?page_id=6101\" data-type=\"page\" data-id=\"4630\">Volume 23, Issue 1<\/a><\/p>\n<\/div>\n\n\n\n<div class=\"wp-block-tkuwpbs5-bs5-column col-md-6 align-self-start\">\n<div class=\"wp-block-tkuwpbs5-bs5-div dv_publish\" data-aos=\"normal\"><div class=\"wp-block-post-date\"><time datetime=\"2026-05-10T02:41:06+08:00\">2026-05-10<\/time><\/div><\/div>\n<\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-tkuwpbs5-bs5-row row\">\n<div class=\"wp-block-tkuwpbs5-bs5-column col-md-5 align-self-start\">\n<div class=\"wp-block-tkuwpbs5-bs5-div au-ol\" data-aos=\"normal\">\n<p>Ming-Hsiu Tsai<a href=\"mailto:mht@gms.tku.edu.tw\"><i class=\"fa fa-envelope\"><\/i><\/a> and Sian-Ren Huang<\/p>\n\n\n\n<p style=\"font-size:14px\">Department of Civil Engineering, Tamkang University, New Taipei City, Taiwan 251, R.O.C.<\/p>\n<\/div>\n\n\n\n<div class=\"wp-block-tkuwpbs5-bs5-div\" style=\"margin-top:var(--wp--preset--spacing--40)\" data-aos=\"normal\">\n<p>Received: September 05, 2018<br>Accepted:\u00a0May 07, 2019<br>Publication Date:\u00a0May 10, 2026<\/p>\n<\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-tkuwpbs5-bs5-column col-md-7 align-self-start clk=\u5716\u7247\"><img decoding=\"async\" src=\"\/jase\/wp-content\/uploads\/2026\/05\/23_1_10.jpg\" class=\"img-fluid img-fluid mx-auto d-block\" alt=\"\u4e0a\u50b3\u5716\u7247\">\n\n\n<p class=\"has-text-align-center img_caption\">(a) Communication network with only formal connections (mapped from the organizational relationships in Figure 8); (b) Communication network with full connections.<\/p>\n<\/div>\n<\/div>\n\n\n\n<p class=\"has-small-font-size\"><i class=\"fab fa-creative-commons\"><\/i>&nbsp;<strong>Copyright&nbsp;<\/strong>The Author(s). This is an open access article distributed under the terms of the&nbsp;<a rel=\"noreferrer noopener\" href=\"https:\/\/creativecommons.org\/licenses\/by\/4.0\/\" target=\"_blank\">Creative Commons Attribution&nbsp;License (CC BY 4.0)<\/a>, which permits unrestricted use, distribution, and reproduction in any medium, provided the original author and source are cited.<\/p>\n\n\n\n<p>Download Citation:&nbsp; <a href=\"\/jase\/wp-content\/uploads\/2026\/05\/V231.0010.bib\" data-type=\"attachment\" data-id=\"6226\" target=\"_blank\" rel=\"noreferrer noopener\">BibTeX <\/a>| <a href=\"http:\/\/dx.doi.org\/10.6180\/jase.202003_23(1).0010\" target=\"_blank\" rel=\"noreferrer noopener\">http:\/\/dx.doi.org\/10.6180\/jase.202003_23(1).0010<\/a>&nbsp;&nbsp;<\/p>\n\n\n\n<p class=\"btn btn-primary article-btn\"><a href=\"\/jase\/wp-content\/uploads\/2026\/05\/10-CE10705_0220_V23i1.pdf\" data-type=\"attachment\" data-id=\"6243\" target=\"_blank\" rel=\"noreferrer noopener\">Download PDF<\/a><\/p>\n\n\n\n<div style=\"height:24px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p>A larger construction project requires the involvement of more professionals in the project team. The efficiency of collaborative interactions among heterogeneous professionals during construction is critical to project success. A social-network-based simulation tool can assist project managers in experimenting and analyzing the efficiency of project teams. Accordingly, this study adopted the social network philosophy to create a team member interaction mechanism and applied the agent-based modeling and simulation approach to develop an agent-based project team collaborative efficiency simulation (PTCES) model for estimating the collaborative efficiency of project teams. In the PTCES model, agents with their collaborative network can execute assigned activities collaboratively so that the team efficiency can be estimated by the simulation manner. An actual building construction case was examined experimentally to calibrate and validate the proposed model, and the results proved the quantitative ability of the PTCES model in estimating team efficiency under different circumstances. The case simulation results also indicated the importance of developing a collaborative culture and reducing the reworking risk for improving the project efficiency. Moreover, a higher collaborative network density was determined to engender higher project efficiency and shorter project duration; however, the impact converged with increasing network density. The proposed model contributes to favorably observing the effect of social network aspects of project management and to efficiently estimating the efficiency and duration of construction projects.<\/p>\n\n\n\n<p><em>Keywords:\u00a0Collaboration, Project Management, Agent-based Modeling and Simulation, Social Network, Construction Process Simulation<\/em><\/p>\n\n\n\n<div style=\"height:2rem\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<div class=\"wp-block-tkuwpbs5-bs5-div ref_ol\" data-aos=\"normal\">\n<ol>\n<li>[1] Son, J., and E. M. Rojas (2011) Evolution of collaboration in temporary project <span class=\"citation-5018 citation-5019 citation-5020 citation-5021 citation-5022 citation-end-5022\">teams: an agent-based modeling and simulation approach, J. Constr. Eng. Manage 137(8), 619\u2013628. doi: 10.1061\/(ASCE)CO.1943-7862.0000331<\/span><\/li>\n<li><span class=\"citation-5013 citation-5014 citation-5015 citation-5016 citation-5017 citation-end-5017\">[2] Bertelsen, S. (2003) Construction as a Complex System, presented at the 11th Annual Meeting of the Int<\/span><span class=\"citation-5013 citation-5014 citation-5015 citation-5016 citation-end-5016\">.<\/span><\/li>\n<li><span class=\"citation-5009 citation-5010 citation-5011 citation-5012 citation-end-5012\">[3] Gould, F., and N. Joyce (2009) Construction Project Managemen<\/span><span class=\"citation-5009 citation-5010 citation-5011 citation-end-5011\">t. 3rd ED. Pearson Higher.<\/span><\/li>\n<li><span class=\"citation-5006 citation-5007 citation-5008\">[<\/span><span class=\"citation-5003 citation-5004 citation-5005 citation-5006 citation-5007 citation-5008 citation-end-5008\">4] Giri, B. E., D. Manongg<\/span><span class=\"citation-5003 citation-5004 citation-5005 citation-5006 citation-5007 citation-end-5007\">a, and A. Iriani (2014) Using social networking analysis (SNA) to analyze collaboration bet<\/span><span class=\"citation-5003 citation-5004 citation-5005 citation-5006 citation-end-5006\">ween stu<\/span><span class=\"citation-5003 citation-5004 citation-5005\">dents (case study: students <\/span><span class=\"citation-5002 citation-5003 citation-5004 citation-5005 citation-end-5005\">of Open University in Kupang), International Journal of Computer Applic<\/span><span class=\"citation-5002 citation-5003 citation-5004 citation-end-5004\">ations 85(1), 39\u201344. doi: 10.5120\/148083<\/span><span class=\"citation-5002 citation-5003 citation-end-5003\">022<\/span><\/li>\n<li><span class=\"citation-5000 citation-5001 citation-end-5001\">[5] <\/span><span class=\"citation-5000\">Labarbe, E., and D. Thiel (2014) Information sharing to reduce misperceptions of interactions <\/span><span class=\"citation-4998 citation-4999 citation-5000 citation-end-5000\">among complementary <\/span><span class=\"citation-4998 citation-4999 citation-end-4999\">projects: a multi-agent approach, Journal of Artificial Societies and Social Simulation 179(1), 1\u20139.<\/span><\/li>\n<li><span class=\"citation-4996 citation-4997\">[6] Jin, Y., and R. E. Levitt (1996) The virtual design team: a computational <\/span><span class=\"citation-4995 citation-4996 citation-4997 citation-end-4997\">model of project organizations, Computational and<\/span><span class=\"citation-4995 citation-4996 citation-end-4996\"> M<\/span><span class=\"citation-4995 citation-end-4995\">athematical Organization Theory 2(3), 171\u2013195. doi: 10.1007\/BF00127273<\/span><\/li>\n<li><span class=\"citation-4994\">[7] Busi, M., and U. S. Bititci (2006) Collaborative performance management: present gaps and future <\/span><span class=\"citation-4993 citation-4994 citation-end-4994\">research, Internati<\/span><span class=\"citation-4993 citation-end-4993\">onal Journal of Productivity and Performance Management 55(1), 7\u201325. doi: 10.1108\/17410400610 635471<\/span><\/li>\n<li><span class=\"citation-4992\">[<\/span><span class=\"citation-4991 citation-4992 citation-end-4992\">8] Horii, T., Jin, Y., and R. E. Levitt (2005) Modeling and analyzing cultural influences on project team performance, Comput<\/span><span class=\"citation-4991 citation-end-4991\">ational and Mathematical Organization Theory 10(4), 305\u2013321. doi: 10.1007\/s10588-0056283-1<\/span><\/li>\n<li><span class=\"citation-4990 citation-end-4990\">[9] <\/span>Carroll, T., and R. M. Burton (2000) Organizations and complexity: searching <span class=\"citation-4989 citation-end-4989\">for the edge of chaos, Computational and Mathematical Organization Theory 6(4), 319\u2013337. doi: 10.1023\/A:1009633728444<\/span><\/li>\n<li><span class=\"citation-4988\">[10] Macal, C. M., and M. J. North (<\/span><span class=\"citation-4986 citation-4987 citation-4988 citation-end-4988\">2010) Tutorial on agent-based modelling and simulation, Journal of Simulation 4(3<\/span><span class=\"citation-4986 citation-4987 citation-end-4987\">), 151\u2013162. doi: 10.1057\/jos.2010.3<\/span><\/li>\n<li><span class=\"citation-4984 citation-4985\">[11] Chinowsky, P., J. Diekmann, and V. Galotti (2008) <\/span><span class=\"citation-4983 citation-4984 citation-4985 citation-end-4985\">Social network model of construction, J. Constr. Eng. Manage. 134(10), 804\u2013<\/span><span class=\"citation-4983 citation-4984 citation-end-4984\">812. d<\/span><span class=\"citation-4983 citation-end-4983\">oi: 10.1061\/(ASCE) 0733-9364(2008)134:10(804)<\/span><\/li>\n<li><span class=\"citation-4982 citation-end-4982\">[12] Levitt, R. E. (2012) The virtual design team: designing project organizations as engineers design bridges, Journal of Or<\/span>ganization Design 1(2), 14\u201341. doi: 10.1287\/ mnsc.45.11.1479<\/li>\n<li>[13] Park, H., S. H. Han, E. M. Rojas, J. Son, and W. Jung (2011) Social network analysis of collaborative <span class=\"citation-4981 citation-end-4981\">ventures for overseas construction projects, J. Constr. Eng. Manage. 137(5), 344\u2013355. doi: 10.1061\/(ASCE) CO.1943-7862.0000301<\/span><\/li>\n<li><span class=\"citation-4980\">[14] Easley, R. F, S. Devaraj, and J. M. Crant (2003) Relating collaborative technology use <\/span><span class=\"citation-4979 citation-4980 citation-end-4980\">to teamwork quality and perform<\/span><span class=\"citation-4979 citation-end-4979\">ance: an empirical analysis, Journal of Management Information Systems 19(4), 247\u2013268.<\/span><\/li>\n<li><span class=\"citation-4978 citation-end-4978\">[15] Love, P. E. D., G. D. Holt, L. Y. Shen, H. Li, and Z. Irani (2002) Using systems dynamics to better understand change and rework <\/span>in construction project management systems, International Journal of Project Management 20(6), 425\u2013436. doi: 10.1016\/S02637863(01)00039-4<\/li>\n<li>[<span class=\"citation-4977\">16] Cheng, M. Y., M. H. Tsai, and Z. W. Xiao (2005) Construction management process reengineering: organizational human <\/span><span class=\"citation-4976 citation-4977 citation-end-4977\">resource planning for multiple projects, Automation in Construction 15(6), 785\u2013799. doi: 10.1016\/j.autcon.2005.10.014<\/span><\/li>\n<li><span class=\"citation-4974 citation-4975 citation-end-4975\">[1<\/span><span class=\"citation-4974\">7] Chang, A. S, F. Y. Shen, and W. Ibbs (2010) Design and construction coordination problems and <\/span><span class=\"citation-4973 citation-4974 citation-end-4974\">planning for design\u2013build pr<\/span><span class=\"citation-4973 citation-end-4973\">oject new users, Canadian Journal of Civil Engineering 37(12), 1525\u20131534. doi: 10.1139\/ L10-090<\/span><\/li>\n<li><span class=\"citation-4972\">[<\/span><span class=\"citation-4971 citation-4972 citation-end-4972\">18] Du, J., and M. El-Gafy (2012) Virtual organizational imitation for construction enterprises: agent-based simulation fram<\/span><span class=\"citation-4971\">ework for exploring <\/span><span class=\"citation-4970 citation-4971 citation-end-4971\">human and organizational implications in construction management, Journal of Computing in Civil Engineering 26(<\/span><span class=\"citation-4970 citation-end-4970\">3), 282297. doi: 10.1061\/(ASCE)CP.1943-5487.0000122<\/span><\/li>\n<li><span class=\"citation-4969\">[19] Wilensky, U., and W. Rand (2015) <\/span><span class=\"citation-4968 citation-4969 citation-end-4969\">An introduction to agent-based modeling: modeling natural, social, and engineered com<\/span><span class=\"citation-4968 citation-end-4968\">plex systems with NetLogo (MIT Press), Kindle Edition 68(8). The MIT Press, 6484\u20136485. doi: 10.1063\/PT.3.2884<\/span><\/li>\n<li><span class=\"citation-4967\">[20] Rapoport, A. (1953) Spread of information through a population with socio-structural bias: <\/span><span class=\"citation-4966 citation-4967 citation-end-4967\">II. Various models with par<\/span><span class=\"citation-4966 citation-end-4966\">tial transitivity. Bulletin of Mathematical Biophysics 15(4), 535\u2013546. doi: 10.1007\/BF02476441<\/span><\/li>\n<li><span class=\"citation-4965 citation-end-4965\">[21] Levitt, R. E., J. Thomsen, and T. R. Christiansen (1999) Simulating project work processes and organizations: toward <\/span><span class=\"citation-4964 citation-end-4964\">a micro-contingency theory of organizational design, Management Science 45(11), 1479\u20131495. doi: 10.1287\/mnsc.45.11.1479<\/span><\/li>\n<li><span class=\"citation-4963\">[22] Fridsma, <\/span><span class=\"citation-4962 citation-4963 citation-end-4963\">D. B. (2003) Organizational Simulation of Medical Work: an Information-processing Approach, Stanford Universit<\/span><span class=\"citation-4962 citation-end-4962\">y, USA.<\/span><\/li>\n<li><span class=\"citation-4961\">[23] Galbraith, J. R. (1984) Organization <\/span><span class=\"citation-4960 citation-4961 citation-end-4961\">design: an information processing view, Organizational Effectiveness 8(3), 21\u201326. doi: <\/span><span class=\"citation-4960 citation-end-4960\">10.1287\/inte.4.3.28<\/span><\/li>\n<li><span class=\"citation-4959\">[24] Liben, N. D., and J. Kleinberg (2007) The link-prediction problem for social networks, <\/span><span class=\"citation-4957 citation-4958 citation-4959 citation-end-4959\">Journal of the American Society for<\/span><span class=\"citation-4957 citation-4958 citation-end-4958\"> Information Science and Technology 58(7), 1019\u20131031. doi: 10.1002\/asi.20591<\/span><\/li>\n<li><span class=\"citation-4955 citation-4956 citation-end-4956\">[25] Kossinets, G., and D. J. Watts (2006) Empirical analysis of an evolving social networt, Science 311(5757), 88\u201390. doi: <\/span><span class=\"citation-4955 citation-end-4955\">10.1<\/span>126\/science.1116869<\/li>\n<li>[26] Informaton on <a class=\"ng-star-inserted\" href=\"http:\/\/jmvidal.cse.sc.edu\/papers\/mas.pdf\" target=\"_blank\" rel=\"noopener\" data-hveid=\"0\" data-ved=\"0CAAQ_4QMahgKEwic8J_a57CVAxUAAAAAHQAAAAAQjgM\">http:\/\/jmvidal.cse.sc.edu\/papers\/mas.pdf<\/a><span class=\"citation-4954 citation-end-4954\">.<\/span><\/li>\n<li><span class=\"citation-4953\">[27] Wilensky, U. (1999) NetLogo, Center for Connected Learni<\/span><span class=\"citation-4952 citation-4953 citation-end-4953\">ng and Computer-Based Modeling Northwestern University, Evanston, IL. Center for Connected Learning and Computer<\/span><span class=\"citation-4952 citation-end-4952\">-Based Modeling. Northwestern University, Evanston.<\/span><\/li>\n<li><span class=\"citation-4951\">[28] Xiang, X., R<\/span><span class=\"citation-4950 citation-4951 citation-end-4951\">. Kennedy, G. Madey, and S. Cabaniss (2005) Verification and v<\/span><span class=\"citation-4950 citation-end-4950\">alidation of agent-based scientific simulation models, Agent-Directed Simulation Conference 47\u201355.<\/span><\/li>\n<li><span class=\"citation-4949 citation-end-4949\">[29] Sargent, R. G. (2012) Verification and validation of si<\/span>mulation model<span class=\"citation-4946 citation-4947 citation-4948 citation-end-4948\">s. 7(1), 12\u201324. doi: 10.1057\/jos.2012. 20<\/span><\/li>\n<li><span class=\"citation-4943 citation-4944 citation-4945 citation-end-4945\">[30] Rutkowski, T. M., K. Kakusho, V. Kryssanov, and M. Minoh (2004) Evaluation of the Communication Atmosphere. Knowledge-Based Intelligent Information and Engineering Systems 3213<\/span><span class=\"citation-4943 citation-4944 citation-end-4944\">(53). Heidelberg: Springer Berl<\/span><span class=\"citation-4943 citation-end-4943\">in Heidelberg,<\/span> Berlin, 364\u2013370. doi: 10.1007\/ 978-3-540-30132-5_53<\/li>\n<\/ol>\n<\/div>\n\n\n\n<p><\/p>\n","protected":false},"author":3,"template":"wp-custom-template-detail-4-aricles","meta":{"_uag_custom_page_level_css":""},"categories":[1200,6,1201],"tags":[1213],"acf":[],"uagb_featured_image_src":[],"uagb_author_info":{"display_name":"\u6797\u923a\u6db5","author_link":"\/jase\/?author=3"},"uagb_comment_info":0,"uagb_excerpt":"&nbsp;Copyright&nbsp;The Author(s). This is an open access article distributed under the terms of the&nbsp;Creative Commons Attribution&nbsp;License (CC BY 4.0), which permits unrestricted use, distribution, and reproduction in any medium, provided the original author and source are cited. Download Citation:&nbsp; BibTeX | http:\/\/dx.doi.org\/10.6180\/jase.202003_23(1).0010&nbsp;&nbsp; Download PDF A larger construction project requires the involvement of more professionals in&hellip;","_links":{"self":[{"href":"\/jase\/index.php?rest_route=\/wp\/v2\/tkuisotope\/6119"}],"collection":[{"href":"\/jase\/index.php?rest_route=\/wp\/v2\/tkuisotope"}],"about":[{"href":"\/jase\/index.php?rest_route=\/wp\/v2\/types\/tkuisotope"}],"author":[{"embeddable":true,"href":"\/jase\/index.php?rest_route=\/wp\/v2\/users\/3"}],"wp:attachment":[{"href":"\/jase\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=6119"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"\/jase\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=6119"},{"taxonomy":"post_tag","embeddable":true,"href":"\/jase\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=6119"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}