{"id":10329,"date":"2026-08-21T19:59:00","date_gmt":"2026-08-21T11:59:00","guid":{"rendered":"\/jase\/?post_type=tkuisotope&#038;p=10329"},"modified":"2026-08-24T22:50:47","modified_gmt":"2026-08-24T14:50:47","slug":"study-on-settlement-prediction-model-of-high-speed-railway-bridge-pile-foundation","status":"publish","type":"tkuisotope","link":"\/jase\/?tkuisotope=study-on-settlement-prediction-model-of-high-speed-railway-bridge-pile-foundation","title":{"rendered":"Study on Settlement Prediction Model of High-Speed Railway Bridge Pile Foundation"},"content":{"rendered":"\n<div class=\"wp-block-tkuwpbs5-bs5-row row article-info\">\n<div class=\"wp-block-tkuwpbs5-bs5-column col-md-3 align-self-start\">\n<p><i class=\"fa fa-folder\" aria-hidden=\"true\"><\/i>&nbsp;<a href=\"\/jase\/?page_id=8451\" data-type=\"page\" data-id=\"8451\">2015<\/a><\/p>\n<\/div>\n\n\n\n<div class=\"wp-block-tkuwpbs5-bs5-column col-md-3 align-self-start\">\n<p><i class=\"fa fa-folder-open\" aria-hidden=\"true\"><\/i>&nbsp;<a href=\"\/jase\/?page_id=8455\" data-type=\"page\" data-id=\"8455\">Volume 18, Issue 2<\/a><\/p>\n<\/div>\n\n\n\n<div class=\"wp-block-tkuwpbs5-bs5-column col-md-6 align-self-start\">\n<div class=\"wp-block-tkuwpbs5-bs5-div dv_publish\" data-aos=\"normal\"><div class=\"wp-block-post-date\"><time datetime=\"2026-08-21T19:59:00+08:00\">2026-08-21<\/time><\/div><\/div>\n<\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-tkuwpbs5-bs5-row row\">\n<div class=\"wp-block-tkuwpbs5-bs5-column col-md-5 align-self-start\">\n<div class=\"wp-block-tkuwpbs5-bs5-div au-ol\" data-aos=\"normal\">\n<p>Zhong-Bo Hu<a href=\"mailto:huzhongbo87@163.com\"><i class=\"fa fa-envelope\"><\/i><\/a>, Jian-Lin Ma, Jun Zhou and Chun-Hui Su<\/p>\n\n\n\n<p style=\"font-size:14px\">School of Civil Engineering, Southwest Jiaotong University, Chengdu City, Sichuan Province 610031, P.R. China<\/p>\n<\/div>\n\n\n\n<div class=\"wp-block-tkuwpbs5-bs5-div\" style=\"margin-top:var(--wp--preset--spacing--40)\" data-aos=\"normal\">\n<p>Received:\u00a0May 01, 2014<br>Accepted:\u00a0April 21, 2015<br>Publication Date:\u00a0August 21, 2026<\/p>\n<\/div>\n<\/div>\n\n\n\n<div class=\"wp-block-tkuwpbs5-bs5-column col-md-7 align-self-start clk=\u5716\u7247\"><img decoding=\"async\" src=\"\/jase\/wp-content\/uploads\/2026\/08\/18_2_12.jpg\" class=\"img-fluid img-fluid mx-auto d-block\" alt=\"\u4e0a\u50b3\u5716\u7247\">\n\n\n<p class=\"has-text-align-center img_caption\">Station map for Beijing-Shanghai High-speed railway.<\/p>\n<\/div>\n<\/div>\n\n\n\n<p class=\"has-small-font-size\"><i class=\"fab fa-creative-commons\"><\/i>&nbsp;<strong>Copyright&nbsp;<\/strong>The Author(s). This is an open access article distributed under the terms of the&nbsp;<a rel=\"noreferrer noopener\" href=\"https:\/\/creativecommons.org\/licenses\/by\/4.0\/\" target=\"_blank\">Creative Commons Attribution&nbsp;License (CC BY 4.0)<\/a>, which permits unrestricted use, distribution, and reproduction in any medium, provided the original author and source are cited.<\/p>\n\n\n\n<p>Download Citation:&nbsp; <a href=\"\/jase\/wp-content\/uploads\/2026\/08\/V18.2.12.bib\" data-type=\"attachment\" data-id=\"10480\" target=\"_blank\" rel=\"noreferrer noopener\">BibTeX <\/a>| <a href=\"http:\/\/dx.doi.org\/10.6180\/jase.2015.18.2.12\" target=\"_blank\" rel=\"noreferrer noopener\">http:\/\/dx.doi.org\/10.6180\/jase.2015.18.2.12<\/a>&nbsp;&nbsp;<\/p>\n\n\n\n<p class=\"btn btn-primary article-btn\"><a href=\"\/jase\/wp-content\/uploads\/2026\/08\/12-10303-1245_V18i2.pdf\" data-type=\"attachment\" data-id=\"10493\" target=\"_blank\" rel=\"noreferrer noopener\">Download PDF<\/a><\/p>\n\n\n\n<div style=\"height:24px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p>Estimation of settlement for bridge pile foundation is critical to the construction of High-speed railway. In this paper, a great number of accurate and reliable settlement data were obtained via on-site long-term monitoring test, and on this basis the settlement laws of pile foundation and the characteristics of settlement-time curve were obtained: the settlement-time curve of bridge pile foundation in Beijing-Shanghai High-speed railway is a ladder-shaped under multiple load, and the conventional settlement prediction model can not reflect the entire process of the relationship between settlement and time. In order to overcome above shortcomings, a new settlement prediction model for bridge pile foundation was proposed in this paper, namely the Modified Exponential model (MEM). This model introduces the concept of load factor and clearly specifies a way to predict the post-construction settlement, and the comparisons of the predicted and measured settlement values are given by the Exponential model (EM), the Logistic model (LM) and the MEM, the results show that: the MEM yields better predictions of the test data than the other models due to it can take into account the measured data before erecting beam, and the level of agreement with the measured data is quite satisfying with its high predicted accuracy and little errors. At last, the influence of parameter beta at different stratum condition and loading combination were analyzed, and the recommended values were given by further gross error analysis and classification.<\/p>\n\n\n\n<p><em>Keywords: Settlement Prediction, The Modified Exponential Model, High-Speed Railway, Bridge Pile Foundation<\/em><\/p>\n\n\n\n<div style=\"height:2rem\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<div class=\"wp-block-tkuwpbs5-bs5-div ref_ol\" data-aos=\"normal\">\n<ol>\n<li>[1] Yang, H. L., Liu, J. X. and Zheng, B., &#8220;Improvement and Application of Grey Prediction GM (1, 1) Model,&#8221; Mathematics in Practice and Theory, Vol. 41, No. 23, pp. 39-46 (2011).<\/li>\n<li>[2] Wang, Z. L., Huang, J. Z. and Li, Y. C., &#8220;Study on Application of Asaoka&#8217;s Method to Settlement Prediction,&#8221; Rock and Soil Mechanics, Vol. 27, No. 11, pp. 2025-2032 (2006).<\/li>\n<li>[3] Zhu, Z. D. and Zhou, L. H., &#8220;Application of Logistic Model in Settlement Prediction During Complete Process of Embankment Construction,&#8221; Chinese Journal of Geotechnical Engineering, Vol. 31, No. 6, pp. 965-969 (2009).<\/li>\n<li>[4] Yu, C. and Liu, S. Y., &#8220;Study on Prediction of Embankment Settlement with the Gompertz Model,&#8221; Rock and Soil Mechanics, Vol. 26, No. 1, pp. 82-86 (2005).<\/li>\n<li>[5] Xiao, Z. Y. and Chen, C. F., &#8220;Settlement Prediction of Soft Clay Roadbed Based on Richards Model,&#8221; Journal of Highway and Transportation Research an Development, Vol. 25, No. 11, pp. 29-32 (2008).<\/li>\n<li>[6] Chen, S. X., Wang, X. Y. and Xu, X. C., &#8220;Three-Point Modified Exponential Curve Method for Prediction Subgrade Settlements,&#8221; Rock and Soil Mechanics, Vol. 32, No. 11, pp. 3355-3360 (2011).<\/li>\n<li>[7] Pan, L. Y. and Xie, X. Y., &#8220;Observational Settlement Prediction by Curve Fitting Methods,&#8221; Rock and Soil Mechanics, Vol. 25, No. 7, pp. 1053-1058 (2004).<\/li>\n<li>[8] Lv, W. T., Wang, Y. H. and Leng, W. M., &#8220;Analysis of In-Situ Static and Dynamic Load Tests for Precast Static Pressure Pile,&#8221; Rock and Soil Mechanics, Vol. 26, No. 2, pp. 251-255 (2005).<\/li>\n<li>[9] Zeng, G. X., Wang, T. R. and Gu, Y. Z., &#8220;Some Aspects of Sand-Drained Ground,&#8221; Journal of Zhejiang University, Vol. 3, No. 3, pp. 74-81 (1981).<\/li>\n<\/ol>\n<\/div>\n\n\n\n<p><\/p>\n","protected":false},"author":3,"template":"wp-custom-template-detail-4-aricles","meta":{"_uag_custom_page_level_css":""},"categories":[1624,6,1626],"tags":[1764],"acf":[],"uagb_featured_image_src":[],"uagb_author_info":{"display_name":"\u6797\u923a\u6db5","author_link":"\/jase\/?author=3"},"uagb_comment_info":0,"uagb_excerpt":"&nbsp;Copyright&nbsp;The Author(s). This is an open access article distributed under the terms of the&nbsp;Creative Commons Attribution&nbsp;License (CC BY 4.0), which permits unrestricted use, distribution, and reproduction in any medium, provided the original author and source are cited. Download Citation:&nbsp; BibTeX | http:\/\/dx.doi.org\/10.6180\/jase.2015.18.2.12&nbsp;&nbsp; Download PDF Estimation of settlement for bridge pile foundation is critical to the&hellip;","_links":{"self":[{"href":"\/jase\/index.php?rest_route=\/wp\/v2\/tkuisotope\/10329"}],"collection":[{"href":"\/jase\/index.php?rest_route=\/wp\/v2\/tkuisotope"}],"about":[{"href":"\/jase\/index.php?rest_route=\/wp\/v2\/types\/tkuisotope"}],"author":[{"embeddable":true,"href":"\/jase\/index.php?rest_route=\/wp\/v2\/users\/3"}],"wp:attachment":[{"href":"\/jase\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=10329"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"\/jase\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=10329"},{"taxonomy":"post_tag","embeddable":true,"href":"\/jase\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=10329"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}