Ruichao Zhang This email address is being protected from spambots. You need JavaScript enabled to view it.1, Zenglin Wang2 , Xinhui Wang3 , Jincheng Wang3 , Guangzheng Zhang3 and Dechun Chen4

1 Shengli College China University of Petroleum, Dongying, 257061, P.R. China
2 Shengli Oil Field, Sinopec, Dongying, 257000, P.R. China
3 Shengli Oil Production Plant, Shengli Oil Field, Sinopec, Dongying, 257000, P.R. China
4 China University of Petroleum, Qingdao, 266580, P.R. China


 

Received: February 28, 2018
Accepted: May 16, 2018
Publication Date: December 1, 2018

Download Citation: ||https://doi.org/10.6180/jase.201812_21(4).0015  

ABSTRACT


Single indicator diagram diagnosis can only diagnose downhole working condition of pumping well, but cannot determine the working condition of ground equipment, and the power displacement diagram contains the working condition information of downhole and ground equipment in rod pumping well production system, which can make up for the deficiency of indicator diagram diagnosis. Therefore, in this paper, based on the indicator diagram diagnosis model of downhole working condition based on the BP neural network, the diagnosis model of ground equipment working condition based on power displacement diagram and the calculation model of power displacement diagram and indicator diagram under the absence of data of indicator diagram, a new method for integrated diagnosis of ground and downhole working conditions in pumping wells with power displacement diagram and indicator diagram is proposed. By comparing the diagnosis results of indicator diagram and power displacement diagram of 10 wells in Shengli Oil field, results shows that the integrated diagnostics method can not only diagnose the downhole working condition of oil well, but also diagnose the ground equipment working conditions, which improve the diagnosis effect of working condition, enlarge the diagnosis range of working condition. It plays the role of supplementary diagnosis in the absence of on-the-spot indicator diagram, and can also be used to diagnose and check each other. The research results can provide technical support for intelligent analysis and optimal decision of oil production system.


Keywords: Rod Pumping Well, Power Displacement Diagram, Indicator Diagram, Ground Working Condition, Downhole Working Condition, Integrated Diagnosis


REFERENCES


  1. [1] Chen, Y. H., J. G. Ye, and Y. Zhou (2015) Technology for Development of High Watercut Oil Reservoir by Polymer Flooding in Dagang Oil field, Oil Drilling & Production Technology 37(3), 98102.
  2. [2] Han, D. K. (2010) Discussions on Concepts, Countermeasures and Technical Routes for the Secondary Development of High Water-cut Oil fields, Petroleum Exploration and Development 37(5), 20. doi: 10.1016/ S1876-3804(10)60055-9
  3. [3] Deng, J. B. (2016) Uniformed Model for Energy Conservation and Optimization of Rod-pumped Wells, Oil Drilling & Production Technology 38(6), 842847.
  4. [4] Liu, H., Z. X. Hao, L. G. Wang, and G. Cao (2015) Current Technical Status and Development Trend of Artificial Lift, Acta Petrolei Sinica 36(11), 14411448.
  5. [5] Chen, D. C., L. F. Xiao, and R. C. Zhang (2017) A Diagnosis Model on Working Condition of Pumping Unit in Oil Wells Based on Electrical Diagrams, Journal of China University of Petroleum (Edition of Natural Science) 41(2), 108115.
  6. [6] Gibbs, S. G. (1992) Design and Diagnosis of Deviated Rod-pumped Wells, Journal of Petroleum Technology 44(7), 774781. doi: 10.2118/22787-PA
  7. [7] Chen, D. C., Y. Ya, and R. C. Zhang (2017) A New Model Based on Pump Diagram for Measuring Liquid Production Rate of Oil Wells in Real-time, Bulletin of Science and Technology 11, 6064.
  8. [8] Zhang, Q. (2006) Principle and Design of Oil Production Engineering, Master thesis, Dongying: China University of Petroleum Press, 157169.
  9. [9] Gibbs, S. G. (1987) Utility of Motor-speed Measurements in Pumping-well Analysis and Control, SPE Production Engineering 2(3), 199208. doi: 10.2118/13198-PA
  10. [10] Han, G. Q., X. D. Wu, and F. Y. Mao (2003) Application of Dynamometer Card Identification in Diagnosis of Working Condition for Suck Rod Pump, Oil Drilling & Production Technology 25(5), 7074.
  11. [11] Sun, D. (2012) Research on the Technology of Remote Intelligent Fault Diagnosis Based on Electrical Parameters of Pumping Unit, Process Automation Instrumentation 33(5), 2224.
  12. [12] Liu, K. X. (2012) The Study on Electrical Parameter Inversion of Dynamometer Card for Pumping Well, Master thesis, Daqing: Northeast Petroleum University.
  13. [13] Xie, X. (2009) Research on Real-time Dynamic Analysis of the System for Pumping Wells, Master thesis, Qingdao: China University of Petroleum (East China).
  14. [14] Shi, Z. B. (2010) The Dynamic Simulation of Rod Pumped Well Based on Observation Surface Dynamometer Card, Master thesis, Qinhuangdao: Yanshan University.
  15. [15] Chen, D. C., F. Lv, and Y. Ya (2017) A New Model Based on the Electrical Diagrams for Diagnosing the Working Status of Belt-pump-unit Wells, Petroleum Geology and Oilfield Development in Daqing 5, 119 123.
  16. [16] Chen, P. Y., C. D. Yao, and S. M. Dong (2013) Simulation Model of Polished Rod Indicator Diagram Based on Measured Electrical Power of Pumping Unit, China Petroleum Machinery 41(11), 9195.
  17. [17] Zhang, G. (2009) The Study of Dynamometer Card’s Indirect Measurement Method, Master thesis, Daqing: Daqing Petroleum Institute.
  18. [18] Sun, Z. H. (2011) The Real-time Evaluation Method for the Beam-pump Recovery System, Master thesis, Qingdao: China University of Petroleum (East China).
  19. [19] Werbos, P. J. (1989) BP and Neurocontrol: a Review and Prospectus, Proc IEEE Trans IT, 209216. doi: 10.1109/IJCNN.1989.118583
  20. [20] Rumelhart, D. E. and J. L. McClelland (1986) Parallel Distributed Processing, MTT Press 11(2), 178194.